-
El Tesoro De Los Angeles– Casa Jose
Project Description: VIP Suite located in the mountains, surrounding Divide, CO. The structure hugs the trees and is built on a steep gradient. No expense was spared!
Project Size: 2,378 sq. ft.
-
El Tesoro De Los Angeles– Casa Jose
Project Description: VIP Suite located in the mountains, surrounding Divide, CO. The structure hugs the trees and is built on a steep gradient. No expense was spared!
Project Size: 2,378 sq. ft.
-
El Tesoro De Los Angeles– Casa Jose
Project Description: VIP Suite located in the mountains, surrounding Divide, CO. The structure hugs the trees and is built on a steep gradient. No expense was spared!
Project Size: 2,378 sq. ft.
-
Every Home for Christ – The Jericho Center
Size: 36,021 square feet. Construction Type: Architectural grade pre-cast concrete with glass curtain walls.
-
Fountain/ Fort Carson Administration Building
Size: 15,000 square feet. Construction Type: Structural steel with brick veneer.
-
Summit Medical Clinic
Size: 8,000 square feet. Construction Type: Wood frame with exposed glulam beams and masonry veneer.
-
Colorado Springs Medical Office Building
Size: 66,000 square feet. Construction Type: Architectural grade pre-cast concrete.
-
John Bevere Ministries World Building
Size: 8,064 square feet. Construction Type: Wood frame with exposed glulam beams and stone and metal exterior.